CALL US:  0412 711 373   TODAY!

Towers / Large Signage Structures Piling

Engineers of towers and large signage structures require foundation systems designed to carry the large overturning moments, tension and compression loads that can develop.

Generally, towers have a relatively small number of screw piles at each specific location. A screw piling rig can be established easily and cost effectively at each individual tower location as compared to moving around large expensive traditional piling equipment. The screw piling rig can also be used in its traditional application to excavate the pile cap and footings prior to installing the screw piles, thus eliminating the need to establish a piling rig and an excavator to complete the construction of the tower foundation.

Screw piles have been used in many situations to provided excellent bearing capacity for both under compressive and tensile loads. The resistance of the helical plate to uplift tension loads results in very high tension pull out loads being achieved from infield testing by Queensland Screwpiers, call us today to discuss applications and concerns.